Fall 2009 Public Review
Technical Changes
Updates to Referenced Documents
Guidelines
Instructions
FAQ
Purchase Codes and Guides
Request a Code Change
Attend a Meeting
Volunteer for Committee Membership
Public Reviews
Committees
Projects
About the Codes
Training
FAQ
Archives
Site Map
National Code Documents - Public Review Fall 2009
sorted :
by subject
/
Technical Changes
Technical Changes
National Building Code
(42 changes)
Division A Compliance, Objectives and Functional Statements
Part 1 Compliance
A-1.3.3.3. Application of Part 9
Division B Acceptable Solutions
(41 changes)
Part 3 Fire Protection, Occupant Safety and Accessibility
(16 changes)
3.1.8.12. Hold-Open Devices
3.1.13.7. High Buildings
3.1.13.11. Elevator Cars
3.2.2.42. Group B, Division 3, Any Height, Any Area, Sprinklered
3.2.5.13. Automatic Sprinkler Systems
A-3.2.5.13.(1) Sprinkler System Design
A-3.2.5.13.(6) Sprinklering of Roof Assemblies
A-3.2.5.19. Fire Pumps
A-3.2.7.6. Emergency Power for Health Care Facilities
3.3.1.18. Guards
A-3.3.1.18. Guard Design Where Climbability is a Lesser Concern
3.3.4.7. Stairs, Handrails and Guards for Dwelling Units
3.4.3.2. Exit Width
3.4.6.5. Guards
3.6.3.1. Fire Separations for Vertical Service Spaces
3.8.3.3. Doorways and Doors
Part 5 Environmental Separation
(2 changes)
5.4.1.1. Required Resistance to Air Leakage
A-5.4.1.1. Resistance to Air Leakage
Part 6 Heating, Ventilating and Air-conditioning
(2 changes)
6.2.1.1. Good Engineering Practice
A-6.2.1.1. Building Pressurization
Part 9 Housing and Small Buildings
(18 changes)
9.3.1.1. General
9.8.8.6. Design to Prevent Climbing
A-9.8.8.6. Risk of Children Climbing Over Guards
9.9.11. Lighting
9.13.4. Soil Gas Control
A-9.13.4., 9.13.4.3., 9.13.4.5. and 9.13.4.7. Soil Gas Barriers
A-9.13.4. Exclusion of Soil Gas
9.13.4.1. Required Soil Gas Control
A-9.13.4.2. Buildings Other than Dwelling Units
9.13.4.3. Soil Gas Control in Masonry Walls
A-9.13.4.3. Providing the Rough-in for a Subfloor Depressurization System
A-9.13.4.3.(1) to (3) Providing Performance Criteria for the Depressurization of the Space Between The Air Barrier And The Ground
A-9.13.4.3.(2) and (6)(a) Effective Depressurization
9.13.4.6. Providing for Subfloor Depressurization
A-9.13.4.6. Soil Gas Control by Depressurization
9.14.5.2. Sump Pits
9.16.2.1. Required Installation of Granular Material
9.18.6.2. Ground Cover in Heated Crawl Spaces
9.32.3.8. Protection Against Depressurization
Appendix C - Climatic and Seismic Information for Building Design in Canada
(2 changes)
Climatic and Seismic Information for Building Design in Canada
Table C-2
Appendix D - Fire-performance ratings
Tables D-3.1.1.A. and B. - Flame-Spread Ratings and Smoke Developed Classifications
Division C Administrative Provisions
(0 changes)
Get Acrobat Reader
Published: 2009-09-28
Important Notices